Whirlpool Heat pump dryer 6th Sense C WD 96M WBS BE

    Promo

    Cashback
    €749.00€879.00-15%
    Our services
    + €109.99
    + €24.90

    Order Online

    • Free delivery

    • Professional installation

    • Home delivery

    • We take back the old device

    Specifications

    Energy class

    A

    Energy consumption per 100 drying cycles

    79

    Noise level class

    A

    Duration of programme

    270

    Condensation efficiency

    94

    Description

    Generous capacity for everyday convenience

    The Whirlpool C WD 96M WBS BE heat pump dryer stands out with its exceptional 9 kg capacity, ideal for large families or handling bulky laundry. With its 127-litre drum, it offers ample space for optimal garment movement and even drying. Its freestanding design and elegant reinforced door blend seamlessly into any interior.

    Smart drying with 6TH SENSE technology

    Equipped with exclusive 6TH SENSE technology, this dryer automatically adjusts the cycle’s duration and intensity based on the humidity level detected inside the drum. The result: perfect drying, without overheating, that respects fabric integrity and extends your clothing’s lifespan. This intelligent function ensures controlled energy consumption and optimal fabric care.

    Connectivity designed for efficiency

    This model offers advanced connectivity, allowing it to receive information from the washing machine about the previous wash cycle. It then adapts its drying program accordingly, delivering flawless results every time. This synergy between appliances transforms your laundry routine into a smooth and efficient experience.

    Advanced technologies for silent and precise performance

    The brushless Inverter motor ensures silent operation and superior energy efficiency. It dynamically adjusts to the cycle's needs while reducing mechanical wear. The specially designed SilentSpin drum coating minimizes noise from zippers and buttons, providing exceptional acoustic comfort.

    Ready-to-wear results and personalized care

    Thanks to IronTouch, say goodbye to long ironing sessions: controlled steam diffusion reduces creasing, delivering ready-to-wear garments straight from the dryer. The AdaptiveDry technology learns from your habits: with HomeWhiz, the appliance gradually adjusts future drying cycles to your preferences, ensuring a fully personalized drying experience.

    Info from the brand